Projects
Six projects, each with the same structure: starting point, decision, implementation, result with measurement, and what I would do differently.
- Project A
MeatMind AI: AI-powered steering tool, end to end as the sole developer
An AI-powered steering tool for production, purchasing, sales and slaughter planning, with integrated forecasting and AI. Built and run by one person. In use at all three sites: 60 people in 90 days, 54 active people in September 2026.
54active people in September 2026, at all three sites60people in 90 days, with 1,074 logins - Project B
Forecast accuracy, shown honestly
Walk-forward over 159 weeks against the previous-week carry-forward. For animals per week, 20.6 instead of 28.2 percent error, so 27 percent less. On the weekly total the simple carry-forward is marginally better, and that is stated here, not in a footnote.
159weeks of walk-forward, all out of sample20.6 %error at the decision level, instead of 28.2 % for carry-forward - Project C
Data platform in operation
57 assets, 16 jobs, around 164 orchestrated steps per working day over around 155 million rows from the connected source systems. Hardened after real incidents. Third site connected, with peak memory brought down from 39.3 to 9.7 gigabytes.
57assets in 16 jobs164orchestrated steps per working day, rounded - Project Fongoing
Agentic AI on company data: MCP, RAG and no text without a number check
My own MCP servers for SAP R/3, data warehouse, Qualifood, fTrace, file system and further sources, used by Claude and locally via Ollama. A RAG assistant that runs fully on premises. Plus a daily briefing for every user, a short profile per customer and a weekly report per salesperson, written by a local language model. Every number in the text is checked against the data. And when AI agents reviewed the platform, I checked the reviewers: 3,258 statements, 82 of them wrong.
46 of 46texts in the sample passed the number check616active customers with a short profile - Project Eongoing
Visitor management: the zone decides, not the job
Ongoing, concept phase. A digital visitor process for all sites, from request to deletion. A rule set of 11 visitor types and 9 zones determines briefing, protective clothing and approval. The connection to the existing access control system is verified from its database, not assumed.
11visitor types in the rule set9hygiene and safety zones - Project Dongoing
Replacing an integration platform
Ongoing. Inventory captured automatically: 99 scheduled processes with dependencies and risk classes. As of October 2026 all 99 processes have been worked through, 96 of them replaced, built or deliberately dropped. 19 already run in parallel to the original.
96 of 99scheduled processes replaced, built or deliberately dropped19processes rebuilt and running in parallel to the original